The inspector arrives before the concrete and before the decking. Here is the build order for a deck, and what to ask your deck builder before you choose wood or composite.

Who gets to your yard first, the concrete truck or the inspector? On a permitted deck, it should be the inspector. In Hastings, Minnesota, footings must be inspected and approved before any concrete is placed, and the finished deck stays off limits until final inspection. A crew that pours first and asks later has a very expensive morning ahead.

That matters to anyone hiring a deck builder, in Los Angeles, Miami or New York as much as anywhere. The order of inspections is the one thing you can check before a single post is set. Hastings is simply the city that publishes its deck packet in plain view, so this story uses it as a worked example. Its numbers are its own. Your city's building department sets yours, and the first question for a builder is which inspections your city requires and who books them. This is a spoke of our Building the Backyard guide in Outdoor Living.

Deck Building Steps From Permit to Final Inspection

This is the order a typical permitted deck follows, with Hastings as the example.

  1. Talk to the building official. Trex says the first step is to speak with the local building official about a permit and restrictions. In Hastings, a house that is a Heritage Preservation Site needs approval from the city planner or the preservation commission before a permit.
  2. Apply for the permit. Hastings asks for a site plan showing distances from property lines, easements, power lines and other structures. TimberTech said a professional deck builder will guide you through the permit process or secure the permit for you.
  3. Call 811. Trex advises locating utilities before anyone digs post holes.
  4. Dig the footings and call for inspection. The concrete waits for approval.
  5. Set posts, beams and the ledger, then frame the joists.
  6. Call the framing inspection where required. Hastings requires a separate one for decks less than 60 inches (5 feet) above grade.
  7. Lay the decking, then build stairs, handrails and guardrails.
  8. Pass final inspection. Hastings requires the stairs and rails to be complete first.

Deck Footings and Frost Depth

Footings are the part nobody sees and the part the inspector looks at first. Trex says footing depth depends on climate, with colder climates needing deeper footings, and that your local department can advise on size. Hastings puts numbers on it: frost footings at least 42 inches deep and 14 inches across the bottom, sized on an assumed soil load-bearing value of 1500 pounds. Those are Minnesota numbers. Ask your builder where your city's figure comes from.

Helical piers are a different path. Hastings requires them to be engineered and installed by licensed installers, with an installation report at final inspection. Pin pier caps stay off so the pins can be measured. Trex adds that complicated designs may call for an engineer.

Deck Framing and Ledger Flashing

Framing is where a deck meets the house, and where water gets in if the work is careless. Hastings requires the ledger to be at least 2x8 nominal treated lumber, not supported on stone or masonry veneer, and flashed so water never touches the house band joist. Beam ends need at least 1.5 inches of bearing on wood or metal and 3 inches on concrete or masonry. Decks held up by cantilevers from the house or another deck are not allowed unless adequate support is proven.

TimberTech said joists are typically spaced 12 to 16 inches on center, with blocking 4 to 6 feet apart. Trex notes many municipalities require railings on decks taller than about 30 inches.

Wood vs Composite Decking

Both materials can pass inspection. The difference on paper is what the city asks you to show.

Wood. TimberTech lists pressure-treated lumber, cedar and ipe. Hastings wants wood decking to be No. 2 grade or better, and either preservative-treated or naturally durable.

Composite. TimberTech describes it as a blend of recycled wood and polymers with an engineered cap. Hastings requires plastic composite to comply with ASTM D7032 and asks applicants for a current code compliance research report with the permit submittal.

This edition found no independent price comparison for either material, so it prints none. The makers' upkeep claims are theirs, and you can test them: ask the builder for a written quote for each material and for the maintenance each needs. Trex lists cost, appearance, ease of installation, durability, longevity, maintenance and warranty as the points to compare. Get each one answered in writing.

Questions to Ask a Deck Builder

Before you choose a material, ask these.

  1. Who pulls the permit, and what will the drawing show? If you do the work yourself, Hastings requires an owner-contractor waiver.
  2. When are the inspections, and which ones does this deck need?
  3. How deep are the footings here, and will the plan use concrete or piers?
  4. If it is composite, can you supply the code report my city wants?
  5. What does each material cost over the long run, not only on day one?

On price, TimberTech said labor is typically one of the largest portions of a deck's cost, and complex designs raise it. A builder who can explain where the labor goes is one worth hiring.

How Long a Small Deck Takes

Trex estimates that a 10x16 ground-level freestanding deck takes 12 hours with a team of two, excluding railing and lighting. That is one long day of work, spread across a permit, a call to 811 and an inspector's visit before the concrete.

Highlights

What is the order of building a deck?

Talk to the building official, get the permit, call 811, dig footings and pass inspection before pouring concrete, frame, pass the framing inspection where required, lay decking and rails, then pass final inspection.

What should I ask a deck builder before choosing wood or composite?

Ask who pulls the permit, which inspections apply, and what each material costs over time in writing. For composite, ask for the code report your city may require.

Can I use a new deck before it is inspected?

In Hastings, no: the deck cannot be used until final inspection, which requires stairs, handrails and guardrails to be complete.

More Stories

From LA Miami NY

A cabana daybed beside a rooftop infinity pool high above a curving bay, beaches and a city skyline
The Letter

Each new story from LA Miami NY, sent to your inbox when it is published. Nothing else. Leave any time.