Living in a House During a Renovation
One Hicksville family planned 16 weeks and lived in the work for 14 months. Set up a bathroom and a food prep space first, then finish the kitchen and follow the trades in order.

A Hicksville, NY family planned a 16-week renovation and, Bob Vila reports, lived in the house for the 14 months it actually took. Nobody can promise you a schedule, but one thing is yours to control before the first wall comes down: a bathroom you can always reach and a place to prepare food. Bolster, a renovation company quoted by Brick Underground, puts those two at the top of its list for anyone staying put.
The food space can be modest. Sebring Design Build, a design-build firm, sets up a temporary kitchen with a microwave, kettle, toaster oven and mini fridge, placed in the part of the house furthest from the construction zone. Thomas Borcherding, who advises remodeling clients, told Homes & Gardens that his kitchen clients get by on toaster ovens and air fryers, and his bathroom clients on a spare bathroom or a gym shower.
Which Room to Finish First
Usually the kitchen. House Digest found that experts and people who have lived through it mostly agree. Tom Nolan of AllStar says the kitchen tends to take longest, so starting there gets a family back to normal sooner. Kristin Kong, a designer, told Homes & Gardens that kitchens often demand the most time and budget. Finishing one first also shows how much budget is left for everything else.
There is one exception. Borcherding says that if new flooring will run unbroken into the kitchen, the kitchen goes first, since new base cabinets change the floor plan. The bathroom follows, because House Digest treats one working bathroom as critical. Bedrooms, living rooms and dining rooms can wait: they disrupt daily life less.
Steps to Stay Home During a Remodel
Once the bathroom and temporary kitchen exist, these are the steps worth acting on.
- Agree on the schedule in writing before demolition: start, phase and end dates, plus working hours (Sebring).
- Settle entry points, deliveries and home security with the contractor (Bolster).
- Ask for at least one sealed-off, construction-free zone, and sleep in the room farthest from the work, with curtains as dust barriers (Bob Vila).
What Living in the House Adds to Time and Cost
Hicksville is the extreme case, but the advice agrees that staying adds time. Chad Hackmann, who estimates remodeling timelines, told Homes & Gardens that a kitchen moving walls, plumbing and electrical runs over six weeks and probably nearly three months, and that living in the home should be expected to stretch the schedule and raise the cost.
Sebring suggests holding back 15 to 20 percent above the contracted price for surprises. It also says a bathroom remodel often takes the primary bathroom out of use for about 4 to 10 weeks, so ask for a written schedule for the second one. Block Renovation, a renovation company, suggests pairing a bathroom with its connected bedroom so the house gets one demolition and one round of crews arriving.
When Each Trade Shows Up in Your Days
No source gives a calendar by day, but Block Renovation's guide gives the order: structural and systems work, rough-in, drywall and ceilings, cabinets, flooring, tile, countertops and paint, then fixtures. Crews go top down, outside in, and rough before finish.
Demolition. The messiest stretch, which Bolster says usually lasts only a couple of weeks. Bob Vila suggests timing a vacation to it.
Plumbers, electricians and HVAC. They work in open walls, which Block says stay open about two weeks, the cheap moment to add outlets, blocking and insulation. Mark Severino, who works on renovation projects, told Homes & Gardens that crews may need to shut off power, water or HVAC. Sebring says plumbers should warn you before a main water shutoff, and those are typically short.
Drywall, cabinets and floors. Block says existing hardwood is sanded after demolition and rough work but before finish carpenters and painters, so expect to stay off it.
Tile, counters, paint and fixtures. The last crews in.
Toni Lewis, who advises homeowners on living on site, told Homes & Gardens that crews must keep your living quarters blocked off and give notice of shutdowns. Her description of the day itself: it typically starts around 7am, with dust, noise and many people coming and going.
Highlights
Which room should be renovated first when you live in the house?
Usually the kitchen: Tom Nolan of AllStar says it takes longest, and House Digest says it takes a big share of the budget. The bathroom comes next, and bedrooms, living rooms and dining rooms can wait.
What do you need to set up before demolition?
At least one working bathroom and a food prep space. Sebring suggests a temporary kitchen with a microwave, kettle, toaster oven and mini fridge, in the part of the house furthest from the work.
What time do crews arrive?
Toni Lewis says the workday typically starts around 7am. Agree working hours and entry points with the contractor in writing before work begins.
Sources
- Which Room You Should Start With To Survive Your Live-In Renovation
- Living in Your Home During a Remodel: 13 Tips | Franklin TN
- How to live at home during a renovation in your NYC brownstone or townhouse
- What’s the best room to renovate first? Experts share their knowhow | Homes and Gardens
- Should you live on-site when renovating a property? | Homes and Gardens
- Live In or Move Out: The Remodeling Dilemma - Bob Vila
- Home Renovation Order: What Comes First in a Remodel