A new house is inspected in stages because each stage hides the last. Here is what gets checked and when, and what the inspectors wish builders knew.

What Home Inspectors Check, Stage by Stage. Wooden frame of a two-story house under construction, with exposed studs, rafters and joists against a blue sky before walls are added.
Photo: L Maule, CC BY-SA 4.0, via Wikimedia Commons

Miss the right week on a new build and some of the house may never be looked at by anyone but the crew. Redfin warns that skipping a window can leave footings or in-wall systems uninspected, which is why it says to book the inspector before construction starts. Drywall has the last word on every wall, so the inspector's job is to speak first. Phase inspections follow the build in four stops:

  1. Pre-pour. Before the slab goes down: site prep, footing trenches, rebar, pipe sleeves, drainage and plumbing stub-outs. The window is usually one or two days.
  2. Pre-drywall. After framing and mechanicals, before insulation and drywall.
  3. Final. A full check of what can be seen and operated, separate from the buyer's blue-tape walkthrough with the builder.
  4. Warranty, optional. A last look near the end of the builder's warranty, so leftover problems get repaired under it.

The footing stage has its own story on this site, so it gets only this mention.

Pre-Drywall Inspection

This is the stage where the most is visible at once. NAR called it a prime time to see plumbing pipes, electrical wiring, duct installation and the roof's structural frame. Redfin adds fire blocking and flashing, and names missing or misaligned hurricane ties, joist hangers and fasteners among the connector checks. Anyone building in Miami has reason to ask about the first of those. Adam Long, president of HomeTeam Inspection Service, told NAR in a March 28, 2024 article that this is the point of phased visits: once walls are in, they hide what is behind them.

Final and Warranty Inspections

The final inspection is not the walkthrough a buyer does with the builder, which Redfin covers in its own checklist. AmeriSpec says its final inspection looks at major structural elements, key system function and basic safety features, with problems fixed before move-in. Long notes the limit: a final inspector covers only what is visible, and does not pull drywall or lift carpet. He suggests one more visit at the 10- to 11-month mark, since most builders offer a one-year repair warranty and will complete buyer punch lists.

Home Inspection Cost

These are national figures, not prices for Los Angeles, Miami or New York. Redfin puts the average at $100-$500 per phase, or about $800-$2000 for a full package of three or four. Long's own estimate, reported by NAR, is about $150 to $200 each, and he advises hiring inspectors with new-home construction training. AmeriSpec says construction process inspections vary by local inspector, so the number that matters is the quote from the one in your city. Redfin also suggests confirming up front that the builder will pause work to fix what is found, and says findings can support a holdback, with funds held in escrow until specific repairs are done.

What Inspectors Wish Builders Knew

Mike Chamberlain, an inspector who wrote for the Insulation Institute, ranked the problems he sees most in new homes:

  1. Grading, where soil around the foundation was not compacted, leaving flat or negative grade.
  2. Siding that is loose, missing flashing or badly installed.
  3. Tied for third: incomplete electrical work (miswired outlets, loose junction boxes, unsafe branch wiring) and incorrectly built decks.

His advice to builders is to slow down and set a fixed series of quality assurance inspections. On insulation, the most common problem is too little or none, which a quality leader could catch quickly. AmeriSpec's list overlaps and adds a poorly supported foundation, non-operational HVAC and incorrect plumbing. It also says not all new homes are built to code, and that contractors often hire subcontractors whom homeowners rarely oversee.

Chamberlain says new construction is under five percent of his company's inspections. His guess is that buyers assume a house that passed code inspections is proven safe. Long's answer, back in that NAR piece, is the one that stays with a builder at the pre-drywall stage: once the walls are in, nobody can see what is behind them.

Highlights

When should a home inspector be booked for a new build?

Before construction starts. Redfin says a missed window can leave footings or in-wall systems uninspected, and the pre-pour window is usually one or two days.

How much do phase inspections cost?

Nationally, Redfin says $100-$500 per phase, or about $800-$2000 for a full package. Inspector Adam Long estimates about $150 to $200 each, and prices vary by local inspector.

What problems do inspectors find most in new homes?

Inspector Mike Chamberlain says grading around the house is the most common, then siding. Incomplete electrical work and incorrectly built decks tie for third.

More Stories

From LA Miami NY