About
The Letter

LAMiamiNY

Design

Architect Fees for a House

A 10% fee on a $1 million project is $100,000 for basic services. Here is what to ask before signing, what the five phases cover, and how the fee gets billed.

Architect Fees for a House. Hand-drawn floor plans of multi-storey houses spread on a table, with white architectural models of the buildings behind them.
Photo: 準建築人手札網站 Forgemind ArchiMedia, CC BY 2.0, via Flickr

A 10% fee on a $1 million project comes to $100,000 for basic services, and on Neumann Monson's example $20,000 of that is due at schematic design. An architect's invoice is a bit like the drawings: most of the trouble hides in what is and isn't included. So before you sign, ask three things:

  1. Which services are basic, and which are supplemental?
  2. Is each supplemental service assigned to the architect in the contract table?
  3. How is each one charged, and where is that written down?

The questions matter to your bill because under the standard AIA scope, the architect is not responsible for a supplemental service unless it is specifically designated to them. Programming, for one, is a supplemental service with its own fee only if it is assigned to the architect. Invoices are generally split, with basic services billed by design phase and supplemental ones as separate line items, and the charging method specified in writing.

When a House Project Needs an Architect

Bob Vila says homeowners may need one for a new build, a remodel, an inconvenient layout, or local building code adherence. Renovation fees can even exceed new-build fees, because of unknowns behind the walls and more site visits. Basic services also include structural, mechanical and electrical engineering, according to Monograph. Anything else is supplemental or additional.

Architect Fees by Construction Phase

AIA's standard scope sets out five phases of basic services, plus supplemental and additional services. Pre-design and programming come before them under a separate scope. The phases, in order:

  1. Schematic Design: the first drawings of the idea. The architect requests your approval before moving on.
  2. Design Development: the approved scheme is worked out in detail, with your approval requested again before the next phase.
  3. Construction Documents: the drawings and specifications a contractor builds from.
  4. Procurement: bidding, when the project is priced and a builder is chosen.
  5. Construction Phase: site visits, submittal review, payment certificates, change orders and completion inspections.

Percentage, Hourly, Flat and By Phase Fees

AIA says it has no guidelines or schedules for how much an architect should be paid, so the method is between you and the architect. These are the ranges the published sources give:

| Payment model | What you pay | Source |
|---|---|---|
| Percentage of construction cost | 5 to 20 percent | Bob Vila |
| Hourly | Principal $150 to $250 an hour | Bob Vila |
| Flat or fixed sum | Negotiated for basic services; no range given | Neumann Monson |
| By phase | A share of the fee per phase, below | Neumann Monson |

Square footage, unit cost and royalty are other methods AIA lists, and fees can combine methods.

When the Architect Fee Is Due

Phase billing is how most of the money moves. Neumann Monson charges 20% for schematic design, 20% for design development, 30% for construction documents, 5% for bidding and 25% for contract administration. Other firms split it differently, so ask for your architect's schedule in writing. On a $100,000 fee, that first 20% is the $20,000 due before a single construction drawing exists.

What Costs Extra

Bob Vila says architects may charge extra for 3D renderings and design revisions. Neumann Monson lists common supplemental services: programming, surveys, landscape and interior design, FF&E design and energy modeling. They can be hourly (programming studies), fixed price (site evaluations) or a percentage, such as an added 1% for FF&E. That is why the three questions come before the headline percentage.

What Happens on an Architect Site Visit

The last phase is the one you can watch. Monograph lists what the architect does during construction: site visits, submittal review, payment certificates, change orders and completion inspections. On Neumann Monson's schedule, 25% of the fee is for that contract administration.

Highlights

Do I need an architect for my house?

Bob Vila says homeowners may need one for a new build, a remodel, an inconvenient layout, or local building code adherence. Basic services also include structural, mechanical and electrical engineering.

How is an architect paid?

Common methods are a percentage of construction cost, hourly rates, a fixed sum, or a combination, usually billed by design phase. AIA has no schedule saying how much an architect should be paid.

What are the five phases of an architect's work?

Schematic Design, Design Development, Construction Documents, Procurement and the Construction Phase. Pre-design and programming come before them under a separate scope.

More Stories

From LA Miami NY

A cabana daybed beside a rooftop infinity pool high above a curving bay, beaches and a city skyline
The Letter

Each new story from LA Miami NY, sent to your inbox when it is published. Nothing else. Leave any time.